Walkthrough

How Draft works, screen by screen.

One yacht's yard period as a single shared record. Every change follows one path: raise, see impact, decide, update. These tabs are where each step lives. Pick an area; it's the real product.

Vessel & period
Switch between your vessels and their yard periods.
Acting as
The same record, seen through a chosen seat; each sees only what it should.
Live numbers
Every figure is computed from approved changes, never hand-stored.

The live position

Every package, its money and its dates: all computed from approved changes, never typed.

Draft overview: M/Y Auriga's package table with baseline vs forecast, splash dates, and the position rail
Package table
Locked baseline vs live forecast, and the cost each package carries.
Splash dates
Planned vs current, with the slip an approved change caused (+6d).
Position rail
The whole period: baseline €337k, forecast €363k, redelivery.

The seats

One record, every role.

Not separate tools or copies of the data, but the same record, with money shown only to those who should see it.

The captain

Raises and decides within an approval limit, full position to hand.

The yard PM

Prices, locks baselines, runs the work, bills what was approved.

The owner / office

Money-first: committed cost, variance, the decisions behind them.

The contractor

A free guest view of only their own package, never project money.

The vessel record

The append-only history itself, kept with the boat for life.

Start your next yard period on Draft.

One system for the yard, the captain, the owner and the contractors.